The Village will construct a continuous multi-use path along the north side of Reed Road from the existing hot mix asphalt path at Reed Road and Vine Street to the signalized intersection of IL Route 47 and Reed Road for an approximate distance of 0.25 mile. The path segment is intended to enhance the pedestrian experience for its users and to fill a gap in the existing path network which facilitates safe access to and from schools for the surrounding neighborhoods. When completed, the project will build upon and connect to existing multi-use path networks which currently serve the Talamore residential subdivision west of Vine Street, the multi-use path network east and north of the IL Route 47 intersection with Reed Road, as well as commercial destinations. The path will also connect to the existing carriage walk pedestrian facilities along both the east and west sides of IL Route 47.

8/7/20 

Construction of the timber safety fence along the retaining wall will continue

 Please expect intermittent daily lane closures in to be put in place during the workday along Reed Road between IL Rt. 47 & Vine Street.

Both Eastbound and Westbound traffic along Reed Road will be maintained.